•Position the sewn horizontal pipe pocket that contains the steel tube (with 5” long flanges at each end) across
the bottom. Lay the (2) straight telescoping tubes on each side after setting their lengths to about 3” less than the interior trailer height and the other tube with
flanges across the top.